<pre id="ymeaf"></pre>

    <table id="ymeaf"></table>

    <track id="ymeaf"></track>
      ChineseEnglish Group official websiteWelcome to the official website of Puyang China Stone Group!
      Your Location:Home>>Solids control
      Mine, tailings, sand processing system (horizontal drilling solid control system)
      Release time:2016-6-7 17:22:21   click:times   【Print】【close

               Mining, mud pile production process to remove the sludge through mud purification system processing, processing out of holes in the soil after delivery to the designated abandon dross pile. After the separation of water directly into the mine or pile foundation in the mud circulation use, so as to achieve energy saving, environmental protection, and efficient purpose.

      Tel:86-393-4800919 Fax:86-393-4800536 Address:henan puyang zhongyuan oilfield drilling mining area 5 a company brigade hospital before drilling Puyang sinopec group co., LTD copyright Record number:豫ICP備11011511號
      韩日av
      <pre id="ymeaf"></pre>

        <table id="ymeaf"></table>

        <track id="ymeaf"></track>